Easy1 markMultiple Choice
CPA · Question 06 · Area 1: Business Analysis
An analyst is reviewing the 'Cost of Quality' report for a manufacturing firm. The report lists the following costs:<br/>1. Warranty claims processing<br/>2. Quality engineering and training<br/>3. Final product testing and inspection<br/>4. Rework of defective units before shipping<br/><br/>Which of these is classified as an 'Internal Failure Cost'?
An analyst is reviewing the 'Cost of Quality' report for a manufacturing firm. The report lists the following costs:<br/>1. Warranty claims processing<br/>2. Quality engineering and training<br/>3. Final product testing and inspection<br/>4. Rework of defective units before shipping<br/><br/>Which of these is classified as an 'Internal Failure Cost'?
Answer options:
A.
Warranty claims processing
B.
Quality engineering and training
C.
Final product testing and inspection
D.
Rework of defective units before shipping
How to approach this question
Categorize each cost: Prevention (stop defects happening), Appraisal (check for defects), Internal Failure (fix defects before shipping), External Failure (fix defects after shipping).
Full Answer
D.Rework of defective units before shipping✓ Correct
D
Cost of Quality categories:<br/>- Prevention: Training, engineering (Item 2)<br/>- Appraisal: Testing, inspection (Item 3)<br/>- Internal Failure: Rework, scrap, downtime (Item 4)<br/>- External Failure: Warranty, returns, lawsuits (Item 1)
Common mistakes
Confusing Appraisal (checking) with Internal Failure (fixing what was found).
Practice the full CPA BAR Practice Exam
50 questions · hints · full answers · grading
More questions from this exam
Q01TechGlobal Inc. is evaluating the performance of its European division using Economic Value Added...HardQ02A manufacturing company is analyzing its production process to identify bottlenecks. The process ...MediumQ03Management is using the COSO Enterprise Risk Management (ERM) framework to address a newly identi...MediumQ04RetailCo is evaluating two strategic initiatives using a Balanced Scorecard approach. <br/>Initia...MediumQ05A company is deciding between two mutually exclusive projects. <br/>Project X: NPV = $50,000, IRR...Medium